To explain the title, Cincinnati built and owns the Cincinnati Southern route, but it now leases it to the Cincinnati, New Orleans & Texas Pacific, which is a wholly-owned subsidiary of Norfolk Southern (formally Southern).
To explain the title, Cincinnati built and owns the Cincinnati Southern route, but it now leases it to the Cincinnati, New Orleans & Texas Pacific, which is a wholly-owned subsidiary of Norfolk Southern.
Dennis DeBruler commented on JoePat's comment Rust can be a problem in the open as well. These rust holes in the side girder are in a former Rock Island overpass in Joliet, IL. The tracks had been removed a long time ago. I heard the issue is that before they paint, they would have to remove the old paint. But the old paint contains lead. I wonder if lead paint is also why they haven't scrapped it. Surely it doesn't have asbestos.
Norfolk Southern serves shippers and receivers of many agricultural products, including corn, wheat, soybeans, miscellaneous grains, animal and poultry feed, sweeteners, ethanol, food oils, flour, beverages, canned goods, and consumer products. Learn more about NS shipping options: http://bit.ly/1KMfSOc
Pictured: train 55E crosses the New River Bridge in Tennessee.
The New River Railroad Bridge is the tallest railroad bridge in the State of Tennessee, at 389 feet above the New River Gorge. The river channel cantilever span stands on two hollow piers, 392 feet apart. The bridge was built along a realignment of Cincinnati Southern's infamous "Rathole" Line, between Danville, Kentucky and Oakdale, Tennessee, to reduce the number of tunnels and fault line crossings on the Cincinnati-to-Chattanooga route. The realignment also lowered the steep incline into the New River Valley northward from Elgin, Tennessee, eliminating the need for the Robbins Tunnel and the old New River crossing. [Bridge Hunter]
I noticed there are several more You Tube videos of this bridge.
A Bridge Hunter comment by Alex Wood: "I was out at the bridge in August and met some construction workers. They were resurfacing the pillars, taking 8 inches of concrete off the pillars and resurfacing. Ironically, the engineer I met said its one of the worst built structures he has worked on in a 30+ year career."